Thursday, August 13, 2026

Current status/parts

Plans #1675 (third edition)

M-drawings

Aerocanard top (Canopy, turtleback, top carbon fiber cowl)

Complete:
Chapter 4
Chapter 5
Chapter 6
Chapter 7
Chapter 8 (minus belts)
Chapter 9 

Chapter 10 - canard built.

Chapter 11 - elevators built.

Chapter 12 - canard installed.

In progress:

Chapter 13 Nose, Nose Gear & Brakes - Dennis Oleman pedals, Matco brake PVPV-D,  MC's (MCMC-4), Nose Wheel, Nose gear strut, Aerocanard nose top and bottom.  Prefabed nose cone, strut cover.

Marc's EGP system (MKNG-6, NG3 & NG4) Nate's MKNG-15.  NG30's installed.

Chapter 14 - Spar built.  

Chapter 15 - Firewall (plywood & SS on hand).

Chapter 16 - Control System - some parts acquired from Cozy Girrrls.  Obtained a parts list from James Russell.

Chapter 17 - Trim system

Chapter 18 Canopy

Chapter 19 - Wing foam, Ailerons & Wing Attach - Eureka CNC cut foam with jigs.  UNI Spar tape (136 yards on hand).  Some control parts on hand.

Landing brake servo installed.
Sump Blisters not installed.
Eyeball air vents 

Chapter 20 - Wings, Aierons & Wing Attach

Chapter 21 - Strakes, Fuel & Baggage - (Ribs & bulkheads are made).

Chapter 22 - Electrical

Chapter 23 - Engine -obtained HD motor mount.  Ordered a new Titan IOX-370 - ETA 8/2027.

Chapter 24 Covers & Fairings - need lower cowl.

Wheel pants  

Fiberfrax


Canard - balanced elevator - with antennas - complete
Spar (Chapter 14) Alodined hard points.



No comments:

Post a Comment