Took about 7 hours to do the bottom spar tape.  Ran into a few minor issues like the thread in the tape snagging and knotting.  The dam and bondo is knocked off.   Still have some epoxy runs to sand off and radius the edges.   The 50:50 hardener mix has worked about right at 65-70 degrees.   

Worked on the down draft table and made some foam panels to close up the the sides.    Think I'll try Velcro since the magnets didn't work very well to hold the panels on.   They need to be easy to put on and take off.